What time of the day do you call this?

December 22, 2005

Not often you see me around at 6.30am. However, as we’re (supposedly) getting a truck full of concrete today at 10.30,I thought I’d get up a little earlier than normal and start clearing a space or two.

Have shifted half of the remaining flat pack cabinets in out of the garage and into the kitchen - seeing as how I won’t be able to one there’s 6″ of concrete between me and my garage/outhouse. *sigh*

So I’m also doing laundry like crazy, put the last load onto tumble last night at 12.45, and swapped it all over at 6.25… I must be insane.

However, at least we won’t have an exposed gas pipe for people to trip over - it’s the yellow one that runs right in front of the back door, which is the one we always use. Safe, eh?
pipe
Oh, and I have no idea what’s in the blue barrels, as the builder dumped them there - possibly a petrol mix for the various stilsaw/tamper type things he’s been using. And yes, he’s the one who left those open bags of plastering compound out too. And it rained last night.

I think the wagon driver should have left the skip and taken the house - would have been tidier…

1 Comment »

The URI to TrackBack this entry is: http://mudandmischief.blogsome.com/2005/12/22/what-time-of-the-day-do-you-call-this/trackback/

  1. Is there any end to the stupidity of your builder?? Those barrels could contain anything toxic and you’ve got small people around!! He needs more than a kick up the ar*e!!!!!

    Comment by Andrea — December 22, 2005 @ 9:41 am

RSS feed for comments on this post.

Leave a comment

Line and paragraph breaks automatic, e-mail address never displayed, HTML allowed: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>



Anti-spam measure: please retype the above text into the box provided.